ADCOP is an extensive 400 KM, 48 inch pipeline including a 14 km submarine section with designed rated delivery capacity of 1.5 million bpd and a designed maximum capacity of 1.8 million bpd from Habshan, Abu Dhabi to Fujairah in order to reduce the reliance on oil terminals in the gulf and decrease shipping congestion through the staits of Hurmouz. This project was awarded by CPECC to EBS for the supply and fabrication of around 5,000 MT of steel for the 26 numbers of Pre-engineered steel buildings in three different pumping stations- Main Pumping Station, Intermediate Pumping Station and the Main Oil Tank.