Key Points
- Project Name : Water Desalination Plant
- Owner : Palm Water
- Consultant : Mott McDonalds
- Total weight : 3,800 Tons
- Area (m)2 : 40,000
- Location : Dubai, UAE
- Year of Construction : 2008
- Duration : (Connection Design, Fabrication and Erection) 11months
- Status : Completed
Description
2 Numbers of Water desalination plant at Palm Jumeriah, Dubai. Steel Structure in top of RCC structure. Connection design, Fabrication and Erection are in EBS Scope of Work. Width :85M Length:94M Height :25M