Desalination Plant

Key Points

  • Project Name : Water Desalination Plant
  • Owner : Palm Water
  • Consultant : Mott McDonalds
  • Total weight : 3,800 Tons
  • Area (m)2 : 40,000
  • Location : Dubai, UAE
  • Year of Construction : 2008
  • Duration : (Connection Design, Fabrication and Erection) 11months
  • Status : Completed

Description

2 Numbers of Water desalination plant at Palm Jumeriah, Dubai. Steel Structure in top of RCC structure. Connection design, Fabrication and Erection are in EBS Scope of Work. Width :85M Length:94M Height :25M