DEWA Power Station

Key Points

  • Project Name : Aweer Gas Turbine Power Station H-Phase II- Dubai
  • Owner : Dubai Electricity & Water Authority(DEWA)
  • Consultant : Mott MCDonald
  • Main Contractor : Arabian Bemco Contracting Co. Ltd.
  • Total Weight : 1,076 Tons
  • Total Area(m)2 : 1,421
  • Location : Dubai, UAE
  • Year of Construction : 2006
  • Duration : (Design, Fabrication and Erection) 7 Months
  • Status : Completed

Description

This extension will increase power output to 1000 MW. EBS scope of work was to design the connections, preparation of the shop drawings, manufacturing, supply and installation of the steel structure, miscellaneous steel work in full conformity with the project documents and specification.