Dorood Onshore facilities was developed for the collection and treatment of 90,000 bpd of crude oil from wells. The project includes water injection and gas injection facilities along with self-sufficient utilities generation. This project was awarded by Petrofac to EBS in 2002 for the supply and fabrication of around 3,000 MT of pre-engineered hot-rolled steel structures and completed on 2003.