Kawther gas field discovered in 2001 and estimated to contain reserves of about 1 trillion cubic feet of gas was developed by PDO in 2006 by installing a gas gathering plant from Al Kawther toSaih Rawl and to Oman Gas Company. This project was awarded by Petrofac and Galfar Engineering t o EBS for the supply and fabrication of approximate 3,600 MT of hot-rolled structural steel for the piperack and platform